Pre-Opening Engineering Solutions, HVAC Rectification, BMS Commissioning & System Restoration
Client: Ibis & Adagio Hotel Apartments – Doha
Location: C-Ring Road, Rawdat al khail, Doha,
Scope: Engineering rectification works, pre-opening readiness, HVAC system solutions, BMS-controlled damper installation, water supply system restoration with VFD integration, and AC installation.
Ibis & Adagio Doha is Qatar’s first dual-brand Ibis & Adagio property, strategically located on C-Ring Road between the vibrant districts of Al Sadd and Msheireb Downtown. With 306 keys, serviced apartments, multiple F&B outlets, a gym, swimming pool, meeting rooms, and a 100-guest function hall, the property required a high level of engineering readiness before opening to the public.
As a specialist MEP and HVAC engineering solutions provider in Qatar, Caltiq Trading, Contracting & Maintenance (CTCM) was appointed to execute the hotel’s pre-opening engineering works, resolve system defects, enhance building performance, and ensure that all mechanical and control systems were fully operational.
Our mandate included:
Caltiq ensured the property met the mechanical, electrical, plumbing, and automation performance standards required for a world-class hospitality operation.
Caltiq’s engineering team delivered a complete suite of technical solutions tailored for high-end hospitality environments. Our approach focused on diagnosing root causes, implementing corrective works, optimizing system performance, and ensuring long-term operational stability.
Our engineering involvement resolved major outstanding issues that had prevented the building from achieving operational readiness.
During pre-opening inspections, the lift lobby experienced severe condensation, creating humidity, fogging, moisture risks, and potential safety hazards.
Caltiq implemented a complete airflow correction strategy:
The condensation issue was completely resolved, stabilizing the humidity and ensuring long-term environmental control in a sensitive guest-circulation area.
A concealed water supply line had failed, resulting in unstable water pressure across multiple floors.
As part of pre-opening enhancement, Caltiq supplied and installed additional AC units in areas requiring extra cooling load.
Works included:
These installations ensured optimal thermal comfort across all operational spaces.
Before Caltiq’s intervention, the Building Management System (BMS) was incomplete, with many offline points and non-functional devices.
The entire automation system was brought online, enabling full control, monitoring, and energy-optimized operation of the hotel’s mechanical systems.
Caltiq’s engineering expertise enabled Ibis & Adagio Doha to:
As a Qatar-based engineering solutions provider, Caltiq successfully delivered a high-performance MEP environment tailored for hospitality operations.