United School International – DX Split AC Refrigerant Leak Rectification

Location: Viva Bahriya Roundabout, The Pearl, Doha, Qatar

Project Type: Educational Facility HVAC Maintenance

Services: DX Split AC Maintenance | Refrigerant Leak Detection | Leak Rectification | Cooling Restoration

PROJECT OVERVIEW

Caltiq carried out DX split AC troubleshooting and corrective HVAC maintenance at United School International, located near Viva Bahriya Roundabout, The Pearl, Doha.

Multiple split AC units were experiencing refrigerant gas leakage and reduced
cooling performance. Caltiq inspected the affected systems, identified the leakagerelated issues, carried out the necessary corrective works, and restored the affected AC
units to proper operating condition.

The works were undertaken with particular attention to maintaining a comfortable indoor
environment within the educational facility.

SCOPE OF WORK BY CALTIQ

TECHNICAL CHALLENGES & CALTIQ SOLUTIONS

Multiple AC Units with Refrigerant Leakage

Several DX split AC units were affected by refrigerant leakage, resulting in reduced
cooling performance and unreliable operation.

Caltiq Solution:
Our HVAC technicians systematically inspected the affected units and refrigerant
circuits, identified the leakage-related points, and carried out the required corrective
works to restore system integrity

Reduced Cooling Performance

Refrigerant loss can significantly affect the cooling capacity and operating efficiency of
DX split AC systems.

Caltiq Solution:
After rectifying the identified leakage issues, the affected systems were serviced and
tested to verify proper refrigerant circuit operation and improved cooling performance.

Maintaining Comfort in an Educational Facility

Reliable air conditioning is particularly important within a school environment, where
classrooms and occupied areas require consistent indoor comfort.

Caltiq Solution:
Caltiq prioritized the affected AC systems and completed the corrective maintenance
efficiently, with operational testing carried out after the works to confirm satisfactory
performance.

PROJECT OUTCOME

Caltiq successfully identified and rectified multiple DX split AC refrigerant leakage issues at United School International.

The affected air-conditioning systems were restored and tested following the corrective
works, resulting in improved cooling performance and more reliable AC operation.

The project demonstrates Caltiq’s capability in DX split AC troubleshooting, refrigerant leak rectification, and commercial HVAC maintenance in Doha, Qatar, particularly within continuously occupied facilities.