

Location: Near Bank Street, Opposite Al Wathan Center, Office No. 105, HBK Al A in Building, Doha, Qatar
Project Type: Caltiq Trading, Contracting & Maintenance W.L.L. undertook HVAC rectification
Services: HVAC Maintenance, FCU Replacement & Chilled Water System Rectification
Caltiq Trading, Contracting & Maintenance W.L.L. undertook HVAC rectification and
chilled water Fan Coil Unit (FCU) replacement works at G.E.D Travel in Doha, Qatar.
The project addressed inadequate cooling performance from the existing chilled water
FCU, thermostat control-related issues and associated HVAC system deficiencies.
The scope included replacing the existing FCU with a new Carrier 5.74 TR chilled water
unit, rectifying damaged chilled water pipe insulation, repairing the condensate drain
line and installing a new Honeywell 2-way control valve and actuator.
The existing FCU was replaced with a new Carrier 5.74 TR chilled water unit to address
the reported inadequate cooling performance and provide a suitable replacement for the
existing equipment.
A new Honeywell 2-way control valve and actuator were installed and connected to the
existing thermostat to support controlled chilled water flow through the FCU.
Damaged insulation was replaced with new thermal insulation and a reinforced vapour
barrier coating system to help prevent condensation and moisture-related deterioration.
The affected drain line slope and U-trap were rectified to support proper condensate
discharge and reduce the risk of drainage-related leakage
Caltiq completed the FCU replacement and associated HVAC rectification works at
G.E.D Travel, addressing the identified cooling, thermostat control, insulation and
drainage concerns.
The project demonstrates Caltiq’s capabilities in chilled water FCU replacement, HVAC
troubleshooting, thermostat control integration, chilled water piping insulation and
mechanical system rectification in Doha, Qatar.
Caltiq – Beyond the Horizon. Engineered to Endure.
G.E.D Website – https://gedtravels.com
WhatsApp us