EZDAN MALL – AL GHARRAFA (JADORE TAILORING)
Annual Preventive Maintenance (AMC) for Chilled Water Fan Coil Units (FCUs)
Client: Jadore Tailoring
Location: Ezdan Mall – Al Gharrafa, Doha
Scope: Preventive maintenance for chilled water FCUs supporting retail cooling operations.
PROJECT OVERVIEW
Jadore Tailoring, located inside Ezdan Mall – Al Gharrafa, relies on chilled water Fan Coil Units (FCUs) to maintain a stable and comfortable indoor environment for customers and staff. Retail outlets inside malls experience variable cooling loads, making well-maintained FCUs essential for consistent temperature control.
Caltiq Trading, Contracting & Maintenance (CTCM) was appointed to carry out a complete Annual Maintenance Contract (AMC) for the FCU systems serving the shop. The focus is to enhance cooling efficiency, prevent downtime, and ensure reliable operation throughout the year.
1. FCU Preventive Maintenance
Caltiq performed full preventive servicing for all FCUs, including:
- Deep cleaning of cooling coils
- Washing or replacing filters
- Clearing condensate drain lines to prevent leakage
- Inspecting chilled water valves and actuator operation
- Checking blower motors, belts, and airflow output
- Tightening electrical connections and thermostat wiring
- Inspecting insulation on accessible chilled water piping
This preventive care improves cooling performance and eliminates common operational issues.
2. Cooling Performance Optimization
To maintain comfortable temperatures inside the tailoring outlet, Caltiq conducted:
- Airflow balancing for uniform distribution
- Supply and return temperature checks
- Chilled water flow and valve adjustment
- Vibration and noise analysis for FCU fans
These measures eliminated hotspots and ensured consistent cooling across the shop.
3. Corrective & On-Call Support
Caltiq provided rapid-response support for:
- No cooling or reduced airflow
- Water leaks from FCUs
- Thermostat malfunction
- Valve or actuator failures
- Unusual noise or vibration
This ensured uninterrupted operation during mall working hours.
PROJECT OUTCOME
Through Caltiq’s AMC services, Jadore Tailoring achieved:
- Stable and efficient cooling performance
- Reduced risk of FCU failures and water leakage
- Improved customer comfort and shopping ambience
- Better energy efficiency and lower operating costs
- Reliable HVAC operation suitable for mall retail environments
Caltiq continues to support Jadore Tailoring as a trusted FCU maintenance partner in Ezdan Mall – Al Gharrafa.
Other Projects
- AL DIBLE TOWER
- VILLA RENOVATION
- ROUM ORTHODOX CHURCH
- IBIS & ADAGIO HOTEL APARTMENTS
- MULTILINK TRADING
- NEW MIDDLE EAST MARKETING & SERVICES
- AL KHEESA PALATIAL VILLA
- IBERDROLA QSTP LLC
- LA PLAGE VILLA
- PRIVATE VILLA
- HA & N GROUP
- ALMAS WATER FACTORY
- LA PLAGE VILLA – LP 07
- TATWEER REAL ESTATE
- AL JASSIM COMPOUND
- VILLA RENOVATION – NEW SALATA
- CITY CENTRE
- EZDAN MALL
- AL REEM GARDENS
- TA3DEEL TRADING & CONTRACTING
- TECHSPINE QATAR

