Caltiq Trading & Contracting

IBERDROLA QSTP LLC – TECH A1

Annual Preventive Maintenance (AMC) – AHU, FCU, Chilled Water System, Electrical, Plumbing & Fire Alarm

Client: Iberdrola QSTP LLC – Tech A1

Location: Qatar Science & Technology Park (QSTP)

Scope: Annual Preventive Maintenance (AMC) for AHUs, FCUs, chilled water network, electrical systems, plumbing infrastructure, and fire alarm system.

PROJECT OVERVIEW

Iberdrola QSTP LLC operates from the Tech A1 building within Qatar Science & Technology Park, a facility containing laboratories, technical rooms, research spaces, offices, and server environments requiring stable indoor conditions. To support operational continuity, precise climate control, electrical reliability, and safety compliance are essential.

Caltiq Trading, Contracting & Maintenance (CTCM) was appointed as the engineering partner to provide a comprehensive Annual Preventive Maintenance Contract (AMC) covering the building’s AHUs, FCUs, chilled water system, electrical distribution, plumbing services, and fire alarm system. As a specialized engineering solutions provider in Qatar, Caltiq implemented a structured maintenance program ensuring consistent performance, reduced downtime, and compliance with QSTP operational standards.

1. HVAC AMC – AHU, FCU & CHILLED WATER SYSTEM

Tech A1 relies entirely on a central HVAC arrangement consisting of Air Handling Units (AHUs) for main zones, Fan Coil Units (FCUs) across offices and rooms, and a chilled water supply system feeding all units. These systems must operate at optimal efficiency to maintain temperature stability for people, research activities, and electronic equipment.

AHU Preventive Maintenance

Caltiq performed:

These tasks helped maintain proper airflow, temperature control, and indoor air quality.

FCU Preventive Maintenance

For the FCUs distributed throughout offices and labs, Caltiq carried out:

Chilled Water System Maintenance

Caltiq inspected:

Balanced flow and clean coils ensured efficient cooling and energy performance.

2. ELECTRICAL AMC – SAFE & RELIABLE POWER DISTRIBUTION

Tech A1 depends on stable electrical power to support mechanical equipment, lighting, servers, and research devices. Caltiq performed:

This prevented overloads, nuisance tripping, and equipment shutdowns.

3. PLUMBING AMC – WATER SUPPLY, DRAINAGE & PUMPS

Caltiq delivered complete plumbing maintenance covering:

Smooth plumbing operation ensured uninterrupted facility usage.

4. FIRE ALARM SYSTEM – PREVENTIVE SAFETY MAINTENANCE

To maintain safety compliance within QSTP standards, Caltiq performed preventive maintenance on the fire alarm system including:

This ensured rapid detection capability and full system readiness.

5. ENGINEERING SOLUTIONS & CORRECTIVE SUPPORT

Beyond planned AMC visits, Caltiq provided engineering solutions such as:

All corrective works were logged and completed according to engineering best practices.

PROJECT OUTCOME

Through Caltiq’s preventive and corrective engineering services, Iberdrola QSTP LLC achieved:

Caltiq continues to support Tech A1 as a trusted engineering partner at QSTP.